1. TDG Building entailing a 24,000m² high level warehouse
with loading docks. Structure is steel frame with metal roofing
and cladding.
2. Cluster Units of varying sizes constructed in load bearing
blockwork with precast concrete floors and metal cladding and
roofing. Total area is 8,000m²
3. 5 light industrial units with high percentage of office space.
Project included all infrastructural work and services.